Work In Hand


Right now, we’re working on these projects. Check out the list:

SEC Railway
  • Providing of RCC Box in middle span of Bridge No. 137 to remove the existing Steel girder in between Manandragarh- Paradol station under the jurisdiction of Assistant Divisional Engineer/ Manendragarh.
  • Construction of light road Over Bridge (J.ight ROB) in connectiong with clusing of Level Crossing No. AB-6 between Mauhari -Harad Crosing No. AB-68 between Karonji – Bishrampur, Re-building of ROB -95 on NH-78 at K.m. 995/10-11 between Darritola -Nagar and Improvement of road and its approaches of ROB-95, 107,195 &205 under the jurisdication of Assistance Divisional Engineer/Manendragarh
  • Conversion of shew girder of multiple boxes of Bridge No. 171 in Chirimiri Yard, Construction of Light Road Over Bridge (Light ROB) om connection with closing of level crossing no. AB-07 between Mauhari-Harad and level crossing no. AB-09 between Harad-Kotma section under the Jurisdiction of Assistance Divisional Enginner/ Manendragarh
  • Execution of civil works in connection with construction of 01 unit type-II quarter and construction of type-IV quarter (one) at New Delhi.
  • Supply, delivery and staking of 1,00,000 cum machine crushed track ballast as per Railway’s specification at Narozabad Depot from outside Railway land andloading into Railway wagons under the jurisdication of ADEN/UMR of Bilaspur Division
  • Supply and stacking of 47,778 cum machine crushed stone ballans on cess in section between Champ-Baradwar in connection with construction of 3rd line between Champa-Jharsuguda (conforming to specifications of machine crushed stone ballast issued by RDSO, corrected ujpto date)
  • Execution of earthwork in formation upto NG formation level along the NG alignment and upto proposed BG formation level in detour alignment without stopping NG train service between Mandlafort & Nainpur stations (Ch 00 (CSB NIR) to 43000 (MFR)) in connection with Mandlafort-Nainpur-Chhindwara gauge conversion project.
  • supply and stacking of 26000 cum machine crushed stone ballast on cess in section between Kachhpura to Jamtara in connection with Gondia-Jabalpur Gauge Conversion Project.
  • Construction of Limited Heigh Subway (LHS) at LC No: 370 between Dadhapara-Belha on Howrah-Mumbai route on Bilaspur-Balodabzar Road.
  • Construction of Road under bridge for closing of manned LC No: AB-10 in Kotma yard and construction of Road over bridge (composite girder) for closing of manned LC No: AB-11 between Kotma – Baihatola stations on Anuppur – Ambikapur section of Bilaspur Division.
  • Construction of 20 units of type II, 30 units of type III and 6 units of type IV quarters along with water supply, sewer line, road works and misc works including electrical work in WRS colony Raipur for Staff of Diesel Loco Shed Raipur.
  • Construction of RCC Box type (Pre cast and cast in situ) LHSW/FHSW and construction of CC Roads along with associated miscellaneous works e.g. construction of retaining wall, side drains approach roads, protection works, earth work in approaches etc for elimination of LCs at various locations on proposed Gondia-Jabalpur BG alignment in between Kachhpura-Nainpur section.
  • Execution of earthwork & related protection work (including small toe walls, stone pitching, drain works etc,) between Ch: 41100 to Ch:43600 & Ch: 46000 to Ch: 56000 including in the approaches of viaduct Br. No. 84 & Br. No. 89 and allied and miscellaneous works in connection with CWA- NGP gauge conversion project.
  • Construction of Limited Height subway wit pre-cast RCC Boxes includingonly casting or casting and launching of Pre-cast RCC Box & base slab segments at different unmanned level crossing gats between Chainage 97400m (Saonga PH) and Khprikheda Station in Chhindware Nagpur section in connection with Gauge Conversion work of Chhindware-Nagpur section of SEC Railway in Maharastra State
  • Construction of ROBs (with PSC superstructure) at Ch: 35400 & Ch: 41760, construction of aqueduct (with PSC superstructure ) at Ch: 51950 & Ch: 52090 construction of minor bridges (cast in situ and launching of precast RCC Box) and retaining walls in between Ch: 41100 to Ch: 43600 and Ch: 46000 to Ch: 56000 including aillied and miscellaneous works in connection with Chhindwara-Nagpur Gauge conversion project.
  • Construction of Road Over Bridge (Concrete Steel composite girder bridge 1×30.0 m) (composite girder) in lieu of existing old ROB (BK-103) at km 889/31-890/1 between Amlai-Burhar stations on Bilaspur-Katni section of Bilaspur division.
  • Execution of all balance civil works to make section fit for commissioning except ballast supply, track linking and building works in between Nainpur (excluding) – Ghansore (excluding) section (approximately 32 kms) in connection with Gondia-Jabalpur gauge conversion project.
  • Execution of balance civil engineering works in mega block to make section fit for commissioning including dismantling of existing NG track, execution of earthwork in formation, construction of minor/major bridges by launching of precast segments/cast in situ, all passenger amenity works, and other miscellaneous allied works from Ch 0.00 (including Chhindwara yard) to Ch 55000 in connection with Chhindwara – Nagpur Gauge conversion project.
CPWD
  • Construction of boundary wall for Guru Ghasidas University.
  • C/o of various building for Guru Ghasidas Vishwavidyalaya, Bilaspur (C.G.) SH: Institute of Forestry, Institute of Rural Technology and workshop for Institute of Technology including water supply, sanitary installation, drainage and internal electrical installation & DBS.
West Central Railway
  • Proposed earthwork in formation, extension of minor bridges construction of road under bridge drain, realy room, P. way works and other miscallaneous works from Km 915.00 to 917.514 & for patch doubling between Ghatpindral – Belkhada stations on Itarsi-Jabalpur section
  • Proposed Earth work in Formation, Extension of Minor Bridges, Construction of Drain, P. Way wroksand other Miscellaneous works from Km 915 to Km 911.953 for patch doubling from Ghatpindrai Belkheda Stations on Itarsi-Jabalpur Section.
KSKMPCL
  • Design of track, preparation of track diagram/drawings, collection of ballast, procurement of permanent way materials, linking of track and points and crossings, welding of rails into SWP, other miscellaneous works and making the track fit for 75KMPH, obtaining sanction from Railways/CRS, commissioning the siding for traffic, construction of side drains, maintaining the track for 1 year and handing over the track on Reach II from inward line chainage 6560M to 8787M and from outward line chainage 11151.6M to 11354M with all loop lines in connection with the proposed 3600 MW power plant in village Nariyara, Chattisgarh State. (Three Agmt.)
PWD
  • Construction of Girls Higher Secondary School at Ratanpur Vikaskhand Kota Distt. Bilaspur
SAIL BSP
  • Balance railway track works for plant Internal yards at BSP, Bhilai (Pkg 095 B1).
  • Construction of Railway siding and MGR system including earthwork, construction of bridges, supply of ballast and P-way linking in connection with modernization of Peripheral Yard of Bhilai Steel Plant at Bhilai (C.G.) (Pkg 095-A) (Schedule-A).
Moser Baer
  • For supply and installation of complete Railway siding from Jaitahari Railway station of Bilaspur Division to Anuppur Project site indlucing Road bed major and monor bridges, tracks (including supply of Rails) signalling & Telecom and over head electrification and associated equipments for 2×600 MW Anuppur Thermal Power Plant at Annupur District Madhya Pradesh.
RVNL
  • Balance Works of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers, Thick web switches and special sleepers) S&T and OHE & General Electrical works in connection with commissioning Doubling Between Jaithari-Anuppur (14.44 Km) & Miscellaneous Works in Nigaura-Venkatnagar Section in Bilaspur Division of South East Central Railway in Madhya Pradesh State, India
Eastern Railway
  • Earthwork in filling with required compaction in Rly. Embankment, approach road, back filling of PF wall etc. blanketing, turfing, construction of minor bridges, station building (excluding Jairambati), gate lodge etc. and other misc. works from Km. 23.5 to 39.0 from Bishnupur station, Sec-V in connection with construction of new BG line from Tarakeswar to Bishnupur.
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt